Investigation of the Benefits of the Floating Solar Power Plant to be Established on Keban Dam Lake using Penman, Linacre and Artificial Neural Networks Methods

dc.contributor.authorKurt, Savaş
dc.contributor.authorEsen, Hikmet
dc.contributor.authorToka, Unalt Unal
dc.date.accessioned2026-08-12T15:36:05Z
dc.date.issued2025
dc.departmentFırat Üniversitesi
dc.description.abstractIn this study, it will be calculated how much water evaporation will be prevented if a Floating Solar Power Plant (FSPP) is installed on a certain part of the Keban Dam lake in Elazığ (38.41?N, 39.14?E), Türkiye by using the Penman and Linacre methods and the Artificial Neural Networks (ANN) method, which are widely used in evaporation calculation. Thus, it will be calculated how much energy can be produced with this saved water. Keban Hydroelectric Power Plant (HPP), examined in this study, is Türkiye's 3rd largest hydroelectric power plant with an installed power of 1.330 MWe. It is the fourth largest lake in Türkiye and the second largest dam lake after the Atatürk Dam. Keban Dam meets the electrical energy needs of 1.750.733 people in their daily lives with an average electricity production of 5.794.927,279 kWh. It has been calculated that thanks to a floating photovoltaic power plant that will cover 10% of the dam lake, a total of 31.305.282 m3 of water in normal water code will be prevented from evaporating annually, and thanks to this water, energy benefit will be provided with the power plant with an installed power of 6.624,84 MWe. In addition, it has been analyzed that 11.297.018 kWh of electricity can be produced from the dam turbines with the water prevented from evaporating thanks to FSPP. Approximately 72.39 MWe energy is needed for the Ağın, Pertek, Serince, Palu-Kovancılar, Uluova, Kuzova irrigation projects around the Keban Dam lake. It has been determined that the amount of water and energy needed for irrigation of these plains can be obtained thanks to FSPP.
dc.identifier.doi10.46460/ijiea.1647566
dc.identifier.endpage99
dc.identifier.issn2587-1943
dc.identifier.issue1
dc.identifier.startpage88
dc.identifier.trdizinid1325999
dc.identifier.urihttps://doi.org/10.46460/ijiea.1647566
dc.identifier.urihttps://search.trdizin.gov.tr/tr/yayin/detay/1325999
dc.identifier.urihttps://hdl.handle.net/11508/34809
dc.identifier.volume9
dc.indekslendigikaynakTR-Dizin
dc.language.isoen
dc.relation.ispartofInternational Journal of Innovative Engineering Applications
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanı
dc.relation.tubitakinfo:eu-repo/grantAgreement/TUBITAK//
dc.rightsinfo:eu-repo/semantics/openAccess
dc.snmzKA_TR-Dizin_20260511
dc.subjectKeban Dam Lake
dc.subjectevaporation
dc.subjectirrigation system
dc.subjectFloating solar power plant
dc.subjectenergy efficiency gains
dc.titleInvestigation of the Benefits of the Floating Solar Power Plant to be Established on Keban Dam Lake using Penman, Linacre and Artificial Neural Networks Methods