Cleaning of high lead-bearing zinc leaching residue by recovery of lead with alkaline leaching

dc.contributor.authorSahin, Mehmet
dc.contributor.authorErdem, Mehmet
dc.date.accessioned2026-08-12T17:48:27Z
dc.date.issued2015
dc.departmentFırat Üniversitesi
dc.description.abstractIn the hydrometallurgical zinc production processes, huge quantities of solid leaching residues containing different metallic compounds threat the environment are continuously generated around the world. Due to increasing demand of metals and the depletion of high grade natural resources, these types of wastes are gaining great importance in the metallurgical industries. In this study, cleaning of zinc leaching residue, containing 19% Pb in the form of anglesite, by recovering of lead with alkaline leaching was investigated. For this purpose; the effects of NaOH concentration, leaching time and temperature on the Pb recovery from the residue were studied. Under the optimum conditions using NaOH concentration of 11%, L/S ratio of 5, temperature of 100 degrees C, and leaching time of 60 min, the leaching ratio of Pb reached up to 99.6%. Kinetic analysis of the experimental data showed that the leaching was ash layer diffusion controlled with activation energy of 2.78 kJ/mol. Pb could be effectively separated from the pregnant leach solution with chemical precipitation by Na2S and CO2. TCLP and EU Directive EC/2003/33 tests applied to the remaining leach residue showed that it was environmentally stable and nonhazardous waste, respectively. (C) 2015 Elsevier B.V. All rights reserved.
dc.description.sponsorshipScientific and Technological Research Council of Turkey (TUBITAK) [109Y262]
dc.description.sponsorshipThis study was financed by the Scientific and Technological Research Council of Turkey (TUBITAK) under the project number of 109Y262.
dc.identifier.doi10.1016/j.hydromet.2015.03.003
dc.identifier.endpage178
dc.identifier.issn0304-386X
dc.identifier.issn1879-1158
dc.identifier.orcid0000-0002-3544-7203
dc.identifier.scopus2-s2.0-84924872382
dc.identifier.scopusqualityQ1
dc.identifier.startpage170
dc.identifier.urihttps://doi.org/10.1016/j.hydromet.2015.03.003
dc.identifier.urihttps://hdl.handle.net/11508/61435
dc.identifier.volume153
dc.identifier.wosWOS:000353003600021
dc.identifier.wosqualityQ1
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherElsevier
dc.relation.ispartofHydrometallurgy
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.snmzKA_WoS_20260511
dc.subjectZinc leaching residue
dc.subjectCleaning
dc.subjectLead recovery
dc.subjectPressure leaching
dc.subjectKinetics
dc.subjectTCLP
dc.titleCleaning of high lead-bearing zinc leaching residue by recovery of lead with alkaline leaching
dc.typeArticle

Dosyalar