Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study

dc.contributor.authorTuna, M. Cihat
dc.date.accessioned2026-08-12T17:31:52Z
dc.date.issued2013
dc.departmentFırat Üniversitesi
dc.description.abstractThe accurate estimation of long-term resource availability, as represented by discharge, is an essential component of hydropower constructions for generation capacity estimation as well as environment protection on ungauged river basins. Feasibility studies concerning decision-making for various types of items to be used in a hydropower plant on ungauged river basins are important in order to estimate the energy generation, the approximate cost of the project, and the required budget allocation. A feasibility study is necessary which evaluates the energy generation cost, investment and maintenance costs for hydropower projects. The purpose of this study is to analyze the technical feasibility of hydropower plant installations at ungauged sites. A case study is performed to illustrate this investigation. By means of the methodology presented in this research work, it will be possible to carry out sound and successful research to assess the economic feasibility of a hydropower project on ungauged river basins.
dc.identifier.doi10.1007/s13369-013-0590-5
dc.identifier.endpage1367
dc.identifier.issn2193-567X
dc.identifier.issn2191-4281
dc.identifier.issue6
dc.identifier.scopus2-s2.0-84878104463
dc.identifier.scopusqualityQ1
dc.identifier.startpage1359
dc.identifier.urihttps://doi.org/10.1007/s13369-013-0590-5
dc.identifier.urihttps://hdl.handle.net/11508/56428
dc.identifier.volume38
dc.identifier.wosWOS:000319075100007
dc.identifier.wosqualityQ2
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherSpringer Heidelberg
dc.relation.ispartofArabian Journal for Science and Engineering
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/openAccess
dc.snmzKA_WoS_20260511
dc.subjectHydropower
dc.subjectFeasibility report
dc.subjectUngauged river basin
dc.subjectCost estimation
dc.subjectIncome-expense ratio
dc.titleFeasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study
dc.typeArticle

Dosyalar